RFP 64-16 On-Site Wate Water Treatment Facility Pisgah Elementary School DRAWINGS BID TAB
| 1/11/17 | Clark Wyatt 828.232.4244 | Awarded RPB SYSTEMS |
RFP 63-16 Metal Roof Retrofit Charles D Owen Middle School DRAWINGS ADDENDUM #1 ADDENDUM #2 ADDENDUM #3 - REBID BID TAB
| 1/25/16 | Mary Beth Kingston 828.255.5916 | Awarded SOUTHERN METAL SYSTEMS |
RFQ 62-16 Uniforms Maintenance ADDENDUM #1 | 1/4/17 | Greg Hensley 232.4244 | Awarded READ'S UNIFORMS INC |
RFP 61-16 LED Retrofit Kits Systemwide BID TAB
| 9/6/16 | Clark Wyatt 828.232.4244 | Awarded CED INC
|
RFP 60-16 LED Pole Top Light Replace Clyde A Erwin High School ADDENDUM #1
| 12/14/16 | Clark Wyatt 828.232.4244 | Awarded CED INC
GRIGG ELECTRIC CO
M B HAYNES CORP |
RFP 59-16 Field House Renovations Enka Middle School DRAWINGS ADDENDUM #1 ADDENDUM #2 ADDENDUM #3 NOTICE
| 2/8/17 | Tim Fierle828.255.5916 | CLOSED |
RFP 58-16 Asbestos Abatement Unit Pricing Systemwide BID TAB | 11/30/16 | Clark Wyatt 828.232.4244 | Awarded ASHEVILLE GLOBAL ENVIRONMENTAL
DEMOLITION & ASBESTOS REMOVAL
|
57-16 Design Team Services Covered Pool Facilities Systemwide Request for Qualifications
| 11/21/16 | Tim Fierle 828.255.5916 | CLOSED |
RFP 56-16 BIDPKG Bathroom ADA Renovations A C Reynolds Middle School Addendum #1 | 11/18/16 | Mary Beth Kingston 828.255.5916 | Awarded B ALLEN CONSTRUCTION |
RFQ 55-16 Small Tools Stock Maintenance
| 12/14/16 | Mike Mace 828.232.4215 | Awarded ACE HARDWARE
FASTENAL CO
HARDWARE DISTRIBUTORS
JOHNSTONE SUPPLY
MIDWEST TECHNOLOGY PRODUCTS
|
RFQ 54-16 Plumbing Stock Maintenance
| 12/14/16 | Mike Mace 828.232.4215 | Awarded ACE HARDWARE
BEST PLUMBING SPECIALTIES
FASTENAL CO
HAJOCA CORP
PROSOURCE LLC
TMS SOUTH
|
RFQ 53-16 Miscellaneous Stock Maintenance
| 12/14/16
| Mike Mace 828.232.4215 | Awarded ACE HARDWARE SOUTH ASHEVILLE
BATTERY PRO
FASTENAL CO
HARDWARE DISTRIBUTORS
MIDWEST SHOP SUPPLIES NAPA AUTO PARTS
|
RFQ 52 HVAC Stock Maintenance
| 12/14/16
| Mike Mace 828.232.4215 | Awarded ACE HARDWARE SOUTH ASHEVILLE
BAKER DISTRIBUTING CO
JOHNSTONE SUPPLY
UNITED REFRIGERATION |
RFQ 51-16 Grounds Stock Maintenance
| 12/14/16
| Mike Mace 828.232.4215 | Awarded ACE HARDWARE SOUTH ASHEVILLE
BOB LAWRENCE POWER & EQUIPMENT
FASTENAL CO
KUBOTA OF ASHEVILLE
NAPA AUTO PARTS |
RFQ 50-16 Fire/Health/Safety Stock Maintenance
| 12/14/16
| Mike Mace 828.232.4215 | Awarded ACE HARDWARE SOUTH ASHEVILLE
FASTENAL CO
W W GRAINGER
|
RFQ 49-16 Electrical Stock Maintenance
| 12/14/16
| Mike Mace 828.232.4215 | Awarded ACE HARDWARE SOUTH ASHEVILLE
CAMP ELECTRIC CO
CED INC
FASTENAL CO
GRAYBAR ELECTRIC CO
REXEL INC
|
RFQ 48-16 Carpentry Stock Maintenance
| 12/14/16
| Mike Mace 828.232.4215 | Awarded ACE HARDWARE
FASTENAL CO
HARDWARE DISTRIBUTORS INC
SEVEN OAKS DOORS & HARDWARE
W W GRAINGER
|
RFQ 47-16 Automotive Stock Maintenance
| 12/14/16
| Mike Mace 828.232.4215 | Awarded ACE HARDWARE SOUTH ASHEVILLE
FASTENAL CO
INTERSTATE BATTERIES
ISGETT DISTRIBUTORS
NAPA AUTO PARTS
O'REILLY AUTO PARTS
|
RFP 46-16 Bathroom ADA Renovations Enka Middle School Addendum #1
| 11/18/16 | Mary Beth Kingston 828.255.5916 | Awarded B ALLEN CONSTRUCTION |
RFP 45-16 Install Provided LED Light Fixtures Administration Building Addendum #1
| 11/2/16 | Clark Wyatt 828.232.4244 | Awarded GRIGG ELECTRIC CO |
RFP 44-16 Install Provided LED Light Fixtures Systemwide Addendum #1
| 11/2/16 | Clark Wyatt 828.232.4244 | Awarded GRIGG ELECTIRC CO |
RFP 43-16 Pedestrian Bridges Repair A C Reynolds High School ADDENDUM #1 BID TAB
| 11/2/16 | Mary Beth Kingston 828.255.5916 | Awarded B ALLEN CONSTRUCTION |
RFQ 42-16 Freezer Building Replacement STEM/Child Nutrition Requests for Qualifications
| 11/09/16 | Mary Beth Kingston 828.255.5916 | CLOSED |
RFQ 41-16 ReRoofing Design & Construction Administrative Services Request for Qualifications | 11/09/16 | Mary Beth Kingston 828.255.5916 | CLOSED |
40-16 Boiler Replacement W W Estes Elementary School ADDENDUM 1 BID TAB
| 10/12/16 | Al Meskil 828.775.2086 | Awarded PYATT HEATING & AIR |
RFP 39-16 Concrete Unit Prices Systemwide BIDTAB
| 9/21/16 | Belvin Hall 828.232.1101 | Awarded B ALLEN CONSTRUCTION |
RFP 30-16 Playground Surfacing Notice of Bid Opportunity | 6/29/16 | Tim Fierle 828.255.5916 | Closed |
RFP 29-16 Construction Manager At Risk Request for Qualifications | 6/16/16 | Tim Fierle 828.255.5916 | Closed |
RFP 28-16 Additions & Renovations 3 Schools Request for Qualifications | 6/16/16 | Tim Fierle 828.255.5916 | Closed |
RFP 27-16 Fire Extinguisher Inspection & Upgrades Systemwide BID TAB
| 6/15/16 | Michael Kowaluk 828.350.2291 | Awarded PYE BARKER FIRE & SAFETY |
RFP 26-16 Elevator & Handicap Lift Service Systemwide BIDTAB
| 6/15/16 | Michael Kowaluk 828.350.2291 | Awarded KONE INC |
RFP 25-16 Awning & Walkway Cover Contract Systemwide BIDTAB
| 6/8/16 | Derrick Warren 828.232.4244 | Awarded AIR-VENT EXTERIORS |
RFP 24-16 Fire Alarm Recertification Systemwide ATTACHMENT 1 BIDTAB | 6/1/16 | Rick Edwards 828.225.1110 | Awarded SIMPLEXGRINNELL |
RFP 23-16 Renovations to Greenhouses High Schools DRAWINGS SET 1 DRAWINGS SET 2 (Large File) | 6/22/16 | Tim Fierle 828.255.5916 | Awarded STENZEL DEVELOPMENT |
RFP 22-16 Fixed Audience Seating T C Roberson High School BIDTAB
| 6/15/16 | Tim Fierle 828.255.5916 | Awarded LEARNING ENVIRONMENTS |
RFP 21-16 Bleacher Replacement North Buncombe High School BIDTAB
| 6/8/16 | Tim Fierle 828.255.5916 | Awarded LEARNING ENVIRONMENTS |
RFP 20-16 Bleacher Motorization & Gym Floor Replacement Cane Creek Middle School ADDENDUM #1 BID TAB | 6/1/16 | Bevin Hall 828.232.4244 | Awarded B ALLEN CONSTRUCTION |
RFP 19-16 REPLACE SWITCH GEAR Black Mountain Primary School ADDENDUM #1 BID TAB | 6/1/16 | Clark Wyatt 828.232.4244 | Awarded M B HAYNES CORP |
REBID RFP 18-16 Gym Metal Roof Retrofit A C Reynolds High School Drawings ADDENDUM #1 ADDENDUM #2 BID TAB | 5/27/16 | Mary Beth Kingston 828.255.5916 | Drawings SOUTHERN METAL SYSTEMS PENDING |
RFP 17-16 Gutters & Downspout ReplacementUnit BID TAB | 5/18/16 | Belvin Hall 828.225.1108 | Awarded CITYSCAPE ROOFING |
RFP 16-16 Re-Roof CTE Wing & Canopies Enka High School Drawings ADDENDUM #1 ADDENDUM #2 ADDENDUM #3 | 5/18/16 | Mary Beth Kingston828.255.5916 | PENDING Drawing Submittal CAROLINA MOUNTAIN ROOFING |
RFP 15-16 Partial Roof Replacement Valley Springs Middle Drawings ADDENDUM #1 ADDENDUM 1 DRAWINGS ADDENDUM #2 | 5/16/16 | Mary Beth Kingston 828.255.5916 | PENDING Submittal Prep: BENTON ROOFING |
RFP 14-16 Chiller Replacement T C Roberson High School | 5/11/16 | Al Meskil 828.775.2086 | Awarded M B HAYNES CORP |
RE-BID RFP 13-16 Retrofit Metal Roof Phase III Enka Middle School DRAWINGS ADDENDUM #1 ADDENDUM #2 | 5/19/16 | Mary Beth Kingston 828.255.5916 | PENDING Drawing Prep: SOUTHERN METAL SYSTEMS |
RFP 12-16 Cafeteria PEP Pool Roof Replacement T C Roberson High School ADDENDUM #1 ADDENDUM #2 ADDENDUM #3 ADDENDUM #4 BID TAB | 5/4/16 | Mary Beth Kingston 828.255.5916 | Awarded SERVICE ONE |
RFP 11-16 Area D2 Roof Replacement Administrative Services Addendum #1 Addendum #2 BID TAB | 5/4/16 | Mary Beth Kingston 828.255.5916 | Awarded J BARTHOLOMEW CONSTRUCTION |
RFP 10-16 Flooring Installation Unit Pricing Systemwide BID TAB | 4/20/16 | Clark Wyatt 828.232.4244 | Awarded CARPET ONE |
RFQ 09-16 Smart Projectors/Interactive Displays Enka Intermediate School ADDENDUM #1 ADDENDUM #2 ADDENDUM #3 | 4/15/16 | Barry Pace 828.255.5097 | Awarded CAMCOR INC |
RFP 08-16 ADA Playground Entry Fairview Elementary School DRAWINGS ADDENDUM #1 ADDENDUM #2 | 4/13/16 | MaryBeth Kingston 828.255.5916 | Awarded CAROLINA CORNERSTONE CONST |
RFP 07-16 Synthetic Turf Field ReplacementClyde A Erwin High School Charles D Owen High School CAEHS DRAWINGS CDOHS DRAWINGS ADDENDUM #1 ADDENDUM #2 BIDTAB | 4/8/16 | Tim Fierle 828.255.5916 | Awarded HELLAS CONSTRUCTION |
RFQ 06-16 PE Equipment Progressive Education Program BID TAB | 3/2/16 | Katherine Thomas 828.255.5943 | Awarded SANDY SPIN SLADE (Skillastics) SCHOOL SPECIALTY INC TOLEDO PHYSICAL EDUCTION SUPPLY |
RE-BID RFP 05-16 Food Lab Renovations Clyde A Erwin High School Enka High School North Buncombe High School DRAWINGS ADDENDUM #1 ADDENDUM #2 ADDENDUM #3 BID TAB | 3/24/16 | Tim Fierle 828.255.5916 | Awarded B ALLEN CONSTRUCTION (EHS) HERITAGE RESTORATION (NBHS) |
RFP 04-16 Roof Repair & Roof Unit Pricing Candler Elementary School Roof Repair Systemwide Unit Pricing DRAWING ADDENDUM #1 ADDENDUM #2 BID TAB | 2/10/16 | Mary Beth Kingston 828.255.5916 | Awarded CAROLINA MOUNTAIN ROOFING |
3-16 Student Pictures Packages Systemwide Notice to Photographers | 2/26/16 | Ron Venturella 828.255.5891 | CLOSED |
RFP 2-16 Staff Support Renovations Avery's Creek Elementary School DRAWINGS ADDENDUM #1 BID TAB | 2/17/16 | Tim Fierle828-255-5916 | Awarded STENZEL DEVELOPMENT |
RFQ 01-16 Bulk Office/Instructional Supplies Warehouse | 2/10/16 | Mike Mace 828.232.4215 | Awarded ASHEVILLE OFFICE SOLUTIONS SCHOOL SPECIALTY
STANDARD STATIONERY SUPPLY |